APOLOGIES Minutes: Apologies were received from Councillor Dryden. |
|
DECLARATION OF INTERESTS Minutes: None were declared. |
|
06/0796/OUT Circus piazza High Street The proposal is for
new public realm consisting of the ‘circus’ or ‘clearing’, piazza and High
Street of the emerging Cambridge Biomedical Campus. The scheme will form
the key landscaping and public realm for the development of adjacent plots,
most importantly new buildings for AstraZeneca (AZ) and Papworth
Hospital to the north and south. The site comprises just under 3 ha of public realm. Procedurally, the
majority of the development will be a reserved matters application. To
the east of the site, approximately 25% of the site falls outside the original
outline permission and will be submitted as a concurrent full planning
application. The campus wide public art contribution will be incorporated
into the scheme. The criteria for
the circus and public realm development are set out in condition 62 of the
outline planning permission 06/0796/OUT. Agent: Guy Kaddish,
Bidwells. Minutes: Summary of proposal The proposal is for new public realm consisting of the ‘circus’ or
‘clearing’, piazza and High Street of the emerging CBC. The scheme will form the key landscaping and public realm for the
development of adjacent plots, most importantly new buildings for AstraZeneca
(AZ) and Papworth Hospital to the north and south.
The site comprises just under 3 ha of public realm. Procedurally, the majority of the development will be a reserved matters
application. To the east of the site, approximately 25% of the site falls
outside the original outline permission and will be submitted as a concurrent
full planning application. The campus wide public art contribution will be
incorporated into the scheme. The criteria for the circus and public realm development are set out in
condition 62 of the outline planning permission 06/0796/OUT. Agent: Guy Kaddish,
Bidwells. Key Points from Developer Presentation
i.
New
Public space will connect the new campus with the existing
site.
ii.
Modal
interchange at the heart of the new CBC will be a key
function of the space.
iii.
Key
strategic green space will be delivered.
iv.
New public realm will be an antidote to the
existing hard urban environment.
v.
It will be an exemplar for public art which
is embedded within its design.
vi.
The public artist has ‘guided the pen’ of the
landscape developer team.
vii.
Ryan
Gander, a conceptual artist, was appointed at an early stage.
viii.
‘Campground’
concept developed.
ix.
Based on a ‘clearing’ concept with private
‘garden’ spaces.
x.
This theme is supported by sculptural
proposals.
xi.
Integration
of surrounding buildings – carefully considered.
xii.
Desire
Lines have been integrated into the design.
xiii.
Minimal street clutter.
xiv.
Cambridge
Guided Bus runs through the space.
xv.
Vehicle
speeds are mitigated along its route. Member Questions 1) Disability issues: Are public realm areas and footpaths flush
with the road surface? · Two
raised tables are created providing areas of shared space. · Papworth
Plaza will be a pedestrian friendly environment. · The
scheme is not a full shared surface. · Disability
Panel very happy with the proposals. 2) Clearing: Amenity Building – Will this
be provided? · Amenity
Building not currently considered viable. · The
scheme is ‘future proofed’ for its later inclusion within the Clearing area. · ‘Pop
up’ facility is possible. · Public
art programme may include events around the clearing e.g. fireworks displays
etc. 3) Cycleway – Are cyclists diverted onto
the CGB route ·
The route and function of the CGB route was
explained. It will accommodate buses and
cyclists. 4) Thresholds of adjacent building and
timings for implementation ·
Delivery will be a phased process. ·
Hoardings for AZ and Papworth
Hospital projects overlap the
Circus. This will be carefully managed. ·
It is intended to be onsite mid 2016. 5) What are the drainage proposals? ·
Extensive use of rain gardens. ·
A section of the clearing is designed to
flood under storm events. ·
Rain gardens will improve the quality of
water into the watercourse. 6) What is the scale ... view the full minutes text for item 3. |