Councillor Payne: Herbicide-Free Weed Management

Herbicide-Free Weed Management

 

Council notes:

 

  • That Cambridge Liberal Democrats called for the Council to adopt and trial herbicide-free weed management, both through the declaration of a Biodiversity Emergency in 2019 and through a motion proposing trials in two wards in 2021.

 

  • That the Liberal Democrat motion received unanimous Council support and was welcomed by local environmental organisations and community groups.

 

  • The important contribution made by Pesticide Free Cambridge and others in developing and supporting Cambridge’s herbicide-free ambition.

 

  • That the trials demonstrated the environmental benefits of reducing herbicide use, but also identified significant operational challenges associated with replacing chemical treatment with mechanical and manual methods.

 

  • That mechanical and manual weed removal is more labour-intensive, is affected by weather, seasonal growth, parked vehicles and accumulated detritus, and requires repeat visits because it does not prevent regrowth.

 

  • That, following the trials and investment in specialist equipment, the Council moved to extend herbicide-free weed management across the city.

 

  • That, since then, implementation has been slow, reflecting the difficult and time-consuming nature of herbicide-free weed removal and the need to tackle years of accumulated detritus alongside the visible growth. Consequently, a substantial number of areas are still awaiting treatment, and residents are understandably concerned about the condition of streets and public spaces.

 

  • That responsibility for weed management is divided between Cambridge City Council, Cambridgeshire County Council and other landowners, requiring stronger coordination and clearer information for residents.

 

 

 

Council believes:

 

  • That the Council-led ambition to end the routine use of herbicides remains the right approach for Cambridge and should not be abandoned because its implementation has proved more difficult than anticipated.

 

  • That herbicide-free weed management supports the Council’s commitments to biodiversity, environmental protection and more sustainable management of public spaces.

 

  • That environmental ambition must be matched by effective implementation, sufficient resources, suitable equipment and an honest assessment of what is required to deliver the service successfully.

 

  • That Cambridge residents are entitled to streets and public spaces that are safe, accessible, properly maintained and attractive.

 

  • That priority must be given to weed growth that obstructs footways, affects accessibility, restricts drainage, creates a safety concern or risks damage to highways and other infrastructure.

 

  • That some vegetation can be tolerated where it does not affect safety, accessibility, drainage, infrastructure or the reasonable enjoyment of public space.

 

  • That residents should be given clear information about the standards they can expect from an herbicide-free service, including the greater likelihood of seasonal growth and regrowth between treatments.

 

  • That the present difficulties require decisive corrective action and additional support for the service, rather than any retreat from the Council’s herbicide-free commitment.

 

Council therefore calls on the Leader and Executive Councillor to:

 

  • Reaffirm the Council’s commitment to the Liberal Democrat-led ambition of ending the routine use of herbicides on land managed by the City Council.

 

 

  • Commission an urgent officer review of the current weed-management programme, identifying:
    • the reasons for departure from the original programme;
    • the extent of the outstanding work;
    • the staffing, equipment and financial capacity required;
    • the effectiveness and whole-life cost of the different mechanical and manual methods;
    • the frequency of repeat treatment needed;
    • seasonal and weather-related constraints;
    • the effect of parked vehicles and other access restrictions; and
    • opportunities for better coordination with the County Council, contractors, communities and other landowners.

 

  • Bring forward a costed, non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance.

 

  • Ensure that any short-term intervention is supported by a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment.

 

  • Develop a risk-based approach that prioritises safety, accessibility, drainage, transport routes and the protection of public infrastructure.

 

  • Continue to test and evaluate new equipment and working methods, drawing on operational evidence from Cambridge and good practice elsewhere.

 

  • Bring forward any necessary budget bid for 2027-28, clearly distinguishing between the one-off cost of recovering the service and the recurrent resources required to maintain it.

 

  • Publish a clear statement for residents setting out responsibilities, priorities, expected service standards, seasonal constraints and how urgent concerns should be reported.

 

  • Introduce transparent performance reporting covering areas completed, outstanding initial treatments, repeat visits, complaints, service requests, costs and operational learning.

 

  • Report the findings of the review, together with costed options and a revised delivery programme, to the relevant scrutiny committee within an agreed timescale.

 

Minutes:

Councillor Dryden left the meeting before this item was considered and did not return.

 

Councillor Payne proposed and Councillor Young seconded the following motion.

 

Council notes:

 

  • That Cambridge Liberal Democrats called for the Council to adopt and trial herbicide-free weed management, both through the declaration of a Biodiversity Emergency in 2019 and through a motion proposing trials in two wards in 2021.

 

  • That the Liberal Democrat motion received unanimous Council support and was welcomed by local environmental organisations and community groups.

 

  • The important contribution made by Pesticide Free Cambridge and others in developing and supporting Cambridge’s herbicide-free ambition.

 

  • That the trials demonstrated the environmental benefits of reducing herbicide use, but also identified significant operational challenges associated with replacing chemical treatment with mechanical and manual methods.

 

  • That mechanical and manual weed removal is more labour-intensive, is affected by weather, seasonal growth, parked vehicles and accumulated detritus, and requires repeat visits because it does not prevent regrowth.

 

  • That, following the trials and investment in specialist equipment, the Council moved to extend herbicide-free weed management across the city.

 

  • That, since then, implementation has been slow, reflecting the difficult and time-consuming nature of herbicide-free weed removal and the need to tackle years of accumulated detritus alongside the visible growth. Consequently, a substantial number of areas are still awaiting treatment, and residents are understandably concerned about the condition of streets and public spaces.

 

  • That responsibility for weed management is divided between Cambridge City Council, Cambridgeshire County Council and other landowners, requiring stronger coordination and clearer information for residents.

 

 

Council believes:

 

  • That the Council-led ambition to end the routine use of herbicides remains the right approach for Cambridge and should not be abandoned because its implementation has proved more difficult than anticipated.

 

  • That herbicide-free weed management supports the Council’s commitments to biodiversity, environmental protection and more sustainable management of public spaces.

 

  • That environmental ambition must be matched by effective implementation, sufficient resources, suitable equipment and an honest assessment of what is required to deliver the service successfully.

 

  • That Cambridge residents are entitled to streets and public spaces that are safe, accessible, properly maintained and attractive.

 

  • That priority must be given to weed growth that obstructs footways, affects accessibility, restricts drainage, creates a safety concern or risks damage to highways and other infrastructure.

 

  • That some vegetation can be tolerated where it does not affect safety, accessibility, drainage, infrastructure or the reasonable enjoyment of public space.

 

  • That residents should be given clear information about the standards they can expect from an herbicide-free service, including the greater likelihood of seasonal growth and regrowth between treatments.

 

  • That the present difficulties require decisive corrective action and additional support for the service, rather than any retreat from the Council’s herbicide-free commitment.

 

Council therefore calls on the Leader and Executive Councillor to:

 

  • Reaffirm the Council’s commitment to the Liberal Democrat-led ambition of ending the routine use of herbicides on land managed by the City Council.

 

 

  • Commission an urgent officer review of the current weed-management programme, identifying:
    • the reasons for departure from the original programme;
    • the extent of the outstanding work;
    • the staffing, equipment and financial capacity required;
    • the effectiveness and whole-life cost of the different mechanical and manual methods;
    • the frequency of repeat treatment needed;
    • seasonal and weather-related constraints;
    • the effect of parked vehicles and other access restrictions; and
    • opportunities for better coordination with the County Council, contractors, communities and other landowners.

 

  • Bring forward a costed, non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance.

 

  • Ensure that any short-term intervention is supported by a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment.

 

  • Develop a risk-based approach that prioritises safety, accessibility, drainage, transport routes and the protection of public infrastructure.

 

  • Continue to test and evaluate new equipment and working methods, drawing on operational evidence from Cambridge and good practice elsewhere.

 

  • Bring forward any necessary budget bid for 2027-28, clearly distinguishing between the one-off cost of recovering the service and the recurrent resources required to maintain it.

 

  • Publish a clear statement for residents setting out responsibilities, priorities, expected service standards, seasonal constraints and how urgent concerns should be reported.

 

  • Introduce transparent performance reporting covering areas completed, outstanding initial treatments, repeat visits, complaints, service requests, costs and operational learning.

 

  • Report the findings of the review, together with costed options and a revised delivery programme, to the relevant scrutiny committee within an agreed timescale.

 

Councillor Smart proposed and Councillor Moore seconded the following amendment (deleted text struck through and additional text underlined):

 

Council notes:

 

·      That in 2019 the Council unanimously supported calling a Biodiversity Emergency, which has since then been put into practice with the Council’s Biodiversity Strategy.

 

·      That in 2021 the Council unanimously supported a herbicide-free trial in two wards which has since then progressed to the adoption of the council’s city-wide Herbicide-Free Weed Strategy in 2025.

 

•          That Cambridge Liberal Democrats called for the Council to adopt and trial herbicide-free weed management, both through the declaration of a Biodiversity Emergency in 2019 and through a motion proposing trials in two wards in 2021.

 

•          That the Liberal Democrat motion received unanimous Council support and was welcomed by local environmental organisations and community groups.

 

•          That Cambridge City Council has been successful in stopping the use of herbicides.

 

•          Certain widely used formulas, such as glyphosate, have been linked by various health organisations and studies to chronic issues, including potential carcinogenic risks and hormone disruption. The World Health Organisation's International Agency for Research on Cancer classified glyphosate as "probably carcinogenic to humans”.

 

•          Herbicides are therefore potentially dangerous to all plant life including edible foodstuffs, as well as animals, including pets.

 

•          It is the policy of this Council to cultivate a healthy, nature-positive urban environment that supports local wildlife and ecosystems.

 

•          That there has been continuing cross-party support for developing a herbicide-free approach in Cambridge.

 

•          Recognises the important contribution made by Pesticide Free Cambridge, On the Verge and others in developing and supporting Cambridge’s herbicide-free ambition.

 

•          That the trials demonstrated the environmental benefits of reducing herbicide use, provided evidence supporting the environmental case for reducing routine herbicide use but also identified significant operational challenges associated with replacing chemical treatment with mechanical and manual methods.

 

•          That mechanical and manual weed removal is more labour-intensive, is affected by weather, seasonal growth, parked vehicles and accumulated detritus, and requires repeat visits because it does not prevent regrowth.

 

•          That, following the trials and investment the Council has invested in specialist equipment, the Council moved in order to extend herbicide-free weed management across the city.

 

•          That the Council’s approved 2025 Herbicide-Free Weed Management Work Programme identified an initial backlog of weed growth requiring intensive treatment before moving to a programme of regular scheduled maintenance

 

 

•          That, since then, implementation has been challenging slow, reflecting the difficult and time-consuming nature of herbicide-free weed removal and the need to tackle years of accumulated detritus alongside the visible growth. Consequently, a substantial number of some areas that are between are still awaiting treatments, and can cause residents to be are understandably concerned about the condition and accessibility of streets and public spaces.

 

·      That there is currently no sufficiently clear and publicly accessible picture of the outstanding backlog, broken down by ward and priority, or of actual delivery against the treatment programme provided in 2025.

 

•          That responsibility for weed management is divided between Cambridge City Council, Cambridgeshire County Council and other landowners, requiring strong stronger coordination and clear clearer information for residents.

 

Council believes:

 

•          That the Council-led ambition to end the routine use of herbicides remains the right approach for Cambridge and should not be abandoned because its implementation has proved more difficult than anticipated. Should be maintained, while recognising that its success depends on a properly resourced, sustainable and effective weed management service.

 

•          That herbicide-free weed management supports the Council’s commitments to biodiversity, environmental protection and more sustainable management of public spaces.

 

•          That environmental ambition must be matched by effective implementation, sufficient resources, suitable equipment and an honest assessment of what is required to deliver the service successfully.

 

•          That Cambridge residents are entitled to streets and public spaces that are safe, accessible, properly maintained and attractive.

 

•          That priority must be given to weed growth that obstructs footways, affects accessibility, restricts drainage, creates a safety concern or risks damage to highways and other infrastructure, though not an exclusive list

 

•          That some vegetation can be tolerated where it does not affect safety, accessibility, drainage, infrastructure or the reasonable enjoyment of public space, though not an exclusive list

 

•          That residents should be given clear information about the standards they can expect from an herbicide-free service, including the greater likelihood of seasonal growth and regrowth between treatments.

 

•          That the present challenges will not cause difficulties require decisive corrective action and additional support for the service, rather than any retreat from the Council’s herbicide-free commitment a clear recovery plan for outstanding work, followed by a sustainable recurring maintenance programme, rather than a retreat from the Council’s commitment to ending the routine use of herbicides.

 

Council therefore calls on the Leader and Executive Councillor to:

 

•          Reaffirm the Council’s commitment to cross-party support for the Liberal Democrat-led ambition of ending the routine use of herbicides on land managed by the City Council.

 

Commission an urgent Officer review of the current weed-management programme, identifying: Require Officers to report on delivery against the Council’s approved 2025 Herbicide-Free Weed Management Work Programme, identifying:

o   the work originally planned and the work actually delivered to date;

o   the current outstanding backlog of outstanding work, broken down by ward and priority;

o   the reasons for any material delays or variance from the approved programme;

o   the staffing, equipment and financial capacity currently available and the capacity required;

o   the effectiveness and whole-life cost of the different mechanical and manual methods;

o   the frequency of repeat treatment required to maintain acceptable standards;

o   seasonal and weather-related constraints;

o   the effect of parked vehicles and other access restrictions; and

o   opportunities for better coordination with the County Council, contractors, communities and other landowners.

o   Any additional costs to the City Council of cutting the County Council’s verges on their behalf.

 

•          the reasons for departure from the original programme;

•          the extent of the outstanding work;

•          the staffing, equipment and financial capacity required;

•          the effectiveness and whole-life cost of the different mechanical and manual methods;

•          the frequency of repeat treatment needed;

•          seasonal and weather-related constraints;

•          the effect of parked vehicles and other access restrictions; and

•          opportunities for better coordination with the County Council, contractors, communities and other landowners.

 

•          Bring forward a costed, non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance.

 

•          Ensure that any short-term intervention is supported by a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment.

 

•          Bring forward an options appraisal for a non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance

 

•          Bring forward an options appraisal for and a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment, including appropriate treatment frequencies for different categories of location.

 

•          Develop a risk-based approach that prioritises safety, accessibility, drainage, transport routes and the protection of public infrastructure.

 

•          Adopt a transparent risk-based prioritisation framework, giving priority to safety, accessibility, drainage, transport routes and the protection of public infrastructure, with clear service standards and target response times.

 

•          Continue to test and evaluate new equipment and working methods, drawing on operational evidence from Cambridge and good practice elsewhere.

 

•          Present Bring forward any necessary suggested budget bid for 2027-28, clearly distinguishing between the one-off cost of recovering the service and the recurrent resources required to maintain it, so that Councillors can make an informed decision weighing up the costs of any necessary bid with any additional savings that will need to be made elsewhere

 

•          Publish a clear statement for residents setting out responsibilities, priorities, expected service standards, seasonal constraints and how urgent concerns should be reported. the division of responsibilities between te City Council, County Council and other landowners; service priorities and standards; seasonal constraints; and how urgent concerns should be reported and escalated.

 

•          Introduce transparent performance reporting covering areas completed, outstanding initial treatments, repeat visits, complaints, service requests, costs and operational learning.

 

 

•          Report the findings of the review, together with costed options and a revised delivery programme, to the relevant scrutiny committee within an agreed timescale.

 

The amendment was carried by 21 votes in favour to 13 against, with 4 abstentions.

 

Councillor Davison proposed and Councillor Clough seconded the following amendment (deleted text struck through and additional text underlined):

 

Council notes:

 

 •That Cambridge Liberal Democrats  called for to adopt and trial herbicide-free weed management, both through the declaration of a Biodiversity Emergency in 2019 and through a motion proposing trials in two wards in 2021 the Council declared a Biodiversity Emergency in 2019 and subsequently supported the introduction and trial of herbicide-free weed management in Cambridge.

 

• That the Liberal Democrat motion received unanimous Council support and was welcomed by local environmental organisations and community groups.

 

 • The important contribution made by Pesticide Free Cambridge and others in developing and supporting Cambridge’s herbicide free ambition.

 

• That the trials demonstrated the environmental benefits of reducing herbicide use, provided evidence supporting the environmental case for reducing routine herbicide use but also identified significant operational challenges associated with replacing chemical treatment with mechanical and manual methods.

 

 • That mechanical and manual weed removal is more labour intensive, is affected by weather, seasonal growth, parked vehicles and accumulated detritus, and requires repeat visits because it does not prevent regrowth.

 

• That, following the trials and investment in specialist equipment, the Council moved to extend herbicide-free weed management across the city.

 

• That the Council’s approved 2025 Herbicide-Free Weed Management Work Programme identified an initial backlog of weed growth requiring intensive treatment before moving to a programme of regular scheduled maintenance

 

 • That, since then, implementation has been slow, reflecting the difficult and time-consuming nature of herbicide-free weed removal and the need to tackle years of accumulated detritus alongside the visible growth. Consequently, a substantial number of areas are still awaiting treatment, and residents are understandably concerned about the condition of streets and public spaces. there remains outstanding work in some areas, and concerns have been raised about the condition and accessibility of streets and public spaces.

 

•  That there is currently no sufficiently clear and publicly accessible picture of the outstanding backlog, broken down by ward and priority, or of actual delivery against the treatment programme approved in 2025.

 

• That responsibility for weed management is divided between Cambridge City Council, Cambridgeshire County Council and other landowners, requiring stronger coordination and clearer information for residents.

 

• That the proposed Civic Quarter capital redevelopment project relies on taking on over £60 million in external borrowing at last estimate, alongside drawing on the Council’s general reserves.

 

• That while there has been adjustment in plans for the Civic Quarter in light of both recent consultation and higher-than-anticipated borrowing costs, concerns remain among traders, residents, and stakeholder groups about disruption caused by the project, as well as project costs and the financial risks associated with a major capital scheme.

 

Council believes:

 

 • That the Council-led ambition to end the routine use of herbicides remains the right approach for Cambridge and should not be abandoned because its implementation has proved more difficult than anticipated.should be maintained, while recognising that its success depends on a properly resourced, sustainable and effective weed management service.

 

 • That herbicide-free weed management supports the Council’s commitments to biodiversity, environmental protection and more sustainable management of public spaces.

 

• That environmental ambition must be matched by effective implementation, sufficient resources, suitable equipment and an honest assessment of what is required to deliver the service successfully.

 

• That Cambridge residents are entitled to streets and public spaces that are safe, accessible, properly maintained and attractive.

 

 • That priority must be given to addressing weed growth that obstructs footways, affects accessibility, restricts drainage, creates a safety concern or risks damage to highways and other infrastructure.

 

• That some vegetation can be tolerated where it does not affect safety, accessibility, drainage, infrastructure or the reasonable enjoyment of public space.

 

• That residents should be given clear information about the standards they can expect from an herbicide-free service, including the greater likelihood of seasonal growth and regrowth between treatments.

 

• That the present difficulties require decisive corrective action and additional support for the service, rather than any retreat from the Council’s herbicide-free commitment. a clear recovery plan for outstanding work, followed by a sustainable recurring maintenance programme, rather than a retreat from the Council’s commitment to ending the routine use of herbicides.

 

• That a commitment of over £60 million in external borrowing, as well as significant draw on the Council’s general reserves, for a major redevelopment project while basic street maintenance is failing due to underfunding reflects flawed financial and civic priorities.

 

Council therefore calls on the Leader and Executive Councillor to:

 

• Reaffirm the Council’s commitment to the Liberal Democrat-led ambition of ending the routine use of herbicides on land managed by the City Council.

 

• Commission an urgent officer review of the current weed management programme, identifying: Require Officers to report on delivery against the Council’s approved 2025 Herbicide-Free Weed Management Work Programme, identifying:

o   the work originally planned and the work actually delivered to date;

o   the current outstanding backlog of outstanding work, broken down by ward and priority;

o   the reasons for any material delays or variance from the approved programme;

o   the staffing, equipment and financial capacity currently available and the capacity required;

o   the effectiveness and whole-life cost of the different mechanical and manual methods;

o   the frequency of repeat treatment required to maintain acceptable standards;

o   seasonal and weather-related constraints;

o   the effect of parked vehicles and other access restrictions; and

o   opportunities for better coordination with the County Council, contractors, communities and other landowners.

§  the reasons for departure from the original programme;

§  the extent of the outstanding work;

§  the staffing, equipment and financial capacity required;

§  the effectiveness and whole-life cost of the different mechanical and manual methods;

§  the frequency of repeat treatment needed; o seasonal and weather-related constraints;

§  the effect of parked vehicles and other access restrictions; and

§  opportunities for better coordination with the County Council, contractors, communities and other landowners.

 

• Bring forward a costed, non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance. time-limited recovery programme to clear the outstanding priority backlog and establish a measurable baseline for future maintenance.

 

• Ensure that any short-term intervention is supported by a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment. Establish a sustainable recurring maintenance programme, including appropriate treatment frequencies for different categories of location, so that areas cleared through the recovery programme do not return to an unsustainable backlog.

 

 • Develop a risk-based approach that prioritises safety, accessibility, drainage, transport routes and the protection of public infrastructure. Adopt a transparent risk-based prioritisation framework, giving priority to safety, accessibility, drainage, transport routes and the protection of public infrastructure, with clear service standards and target response times.

 

• Continue to test and evaluate new equipment and working methods, drawing on operational evidence from Cambridge and good practice elsewhere.

 

• Bring forward any necessary budget bid for 2027-28, clearly distinguishing between the one-off cost of recovering the service and the recurrent resources required to maintain it. clearing the existing backlog and the recurrent staffing, equipment and other resources required to maintain the service thereafter, and setting out the consequences of different funding levels.

 

• Instruct officers to conduct an immediate financial review of the planned Civic Quarter project aimed at scaling back borrowing and capital allocations, with such resources as needed for the above budget bid to be reallocated to frontline street cleansing, gully clearing, and manual weed management teams.

 

• Publish a clear statement for residents setting out responsibilities, priorities, expected service standards, seasonal constraints and how urgent concerns should be reported. the division of responsibilities between the City Council, County Council and other landowners; service priorities and standards; seasonal constraints; and how urgent concerns should be reported and escalated.

 

• Introduce transparent and regular performance reporting covering areas completed, outstanding initial treatments, repeat visits, complaints, service requests, costs and operational learning the outstanding backlog by ward, initial treatments completed, repeat visits, compliance with service standards, complaints and service requests, expenditure, cost per treatment, and operational learning.

 

• Report the findings of the review, together with costed options and a revised delivery programme, to the relevant scrutiny committee within an agreed timescale current backlog, costed recovery options, proposed recurring maintenance programme and measurable service standards to the relevant scrutiny committee within an agreed timescale, with subsequent regular reporting on delivery against those commitments.

 

 

The amendment was lost by 27 votes against to 11 votes in favour.

 

Resolved (36 in favour to 2 against, with 0 abstentions) that:

 

Council notes:

 

·      That in 2019 the Council unanimously supported calling a Biodiversity Emergency, which has since then been put into practice with the Council’s Biodiversity Strategy.

·      That in 2021 the Council unanimously supported a herbicide-free trial in two wards which has since then progressed to the adoption of the council’s city-wide Herbicide-Free Weed Strategy in 2025.

·      That Cambridge City Council has been successful in stopping the use of herbicides.

·      Certain widely used formulas, such as glyphosate, have been linked by various health organisations and studies to chronic issues, including potential carcinogenic risks and hormone disruption. The World Health Organisation's International Agency for Research on Cancer classified glyphosate as "probably carcinogenic to humans”.

·      Herbicides are therefore potentially dangerous to all plant life including edible foodstuffs, as well as animals, including pets.

·      It is the policy of this Council to cultivate a healthy, nature-positive urban environment that supports local wildlife and ecosystems.

·      That there has been continuing cross-party support for developing a herbicide-free approach in Cambridge.

·      Recognises the important contribution made by Pesticide Free Cambridge, On the Verge and others in developing and supporting Cambridge’s herbicide-free ambition.

·      That the trials provided evidence supporting the environmental case for reducing routine herbicide use but also identified significant operational challenges associated with replacing chemical treatment with mechanical and manual methods.

·      That mechanical and manual weed removal is more labour-intensive, is affected by weather, seasonal growth, parked vehicles and accumulated detritus, and requires repeat visits because it does not prevent regrowth.

·      That, the Council has invested in specialist equipment in order to extend herbicide-free weed management across the city.

·      That the Council’s approved 2025 Herbicide-Free Weed Management Work Programme identified an initial backlog of weed growth requiring intensive treatment before moving to a programme of regular scheduled maintenance

·      That, since then, implementation has been challenging, reflecting the difficult and time-consuming nature of herbicide-free weed removal and the need to tackle years of accumulated detritus alongside the visible growth. Consequently, some areas that are between treatments, can cause residents to be understandably concerned about the condition and accessibility of streets and public spaces.

·      That there is currently no sufficiently clear and publicly accessible picture of the outstanding backlog, broken down by ward and priority, or of actual delivery against the treatment programme provided in 2025.

·      That responsibility for weed management is divided between Cambridge City Council, Cambridgeshire County Council and other landowners, requiring strong coordination and clear information for residents.

 

Council believes:

 

·      That the Council-led ambition to end the routine use of herbicides should be maintained, while recognising that its success depends on a properly resourced, sustainable and effective weed management service.

·      That herbicide-free weed management supports the Council’s commitments to biodiversity, environmental protection and more sustainable management of public spaces.

·      That environmental ambition must be matched by effective implementation, sufficient resources, suitable equipment and an honest assessment of what is required to deliver the service successfully.

·      That Cambridge residents are entitled to streets and public spaces that are safe, accessible, properly maintained and attractive.

 

·      That priority must be given to weed growth that obstructs footways, affects accessibility, restricts drainage, creates a safety concern or risks damage to highways and other infrastructure, though not an exclusive list.

·      That some vegetation can be tolerated where it does not affect safety, accessibility, drainage, infrastructure or the reasonable enjoyment of public space, though not an exclusive list.

·      That residents should be given clear information about the standards they can expect from an herbicide-free service, including the greater likelihood of seasonal growth and regrowth between treatments.

·      That the present challenges will not cause any retreat from the Council’s herbicide-free commitment’

·      That the present challenges require a clear recovery plan for outstanding work, followed by a sustainable recurring maintenance programme, rather than a retreat from the Council’s commitment to ending the routine use of herbicides.

 

Council therefore calls on the Leader and Executive Councillor to:

 

·      Reaffirm the Council’s commitment to cross-party support for ending the routine use of herbicides on land managed by the City Council.

·      Require Officers to report on delivery against the Council’s approved 2025 Herbicide-Free Weed Management Work Programme, identifying:

o   the work originally planned and the work actually delivered to date;

o   the current backlog of outstanding work, broken down by ward and priority;

o   the reasons for any material delays or variance from the approved programme;

o   the staffing, equipment and financial capacity currently available and the capacity required;

o   the effectiveness and whole-life cost of the different mechanical and manual methods;

o   the frequency of repeat treatment required to maintain acceptable standards;

o   seasonal and weather-related constraints;

o   the effect of parked vehicles and other access restrictions;

o   opportunities for better coordination with the County Council, contractors, communities and other landowners;

o   any additional costs to the City Council of cutting the County Council’s verges on their behalf.

·      Bring forward an options appraisal for a non-recurring recovery programme to blitz outstanding priority areas and establish a manageable baseline for future maintenance.

·      Bring forward an options appraisal for a sustainable annual maintenance programme, so that areas cleared through the recovery work receive appropriate repeat treatment, including appropriate treatment frequencies for different categories of location.

·      Develop a risk-based approach that prioritises safety, accessibility, drainage, transport routes and the protection of public infrastructure.

 

·      Adopt a transparent risk-based prioritisation framework, giving priority to safety, accessibility, drainage, transport routes and the protection of public infrastructure, with clear service standards and target response times.

·      Continue to test and evaluate new equipment and working methods, drawing on operational evidence from Cambridge and good practice elsewhere.

·      Present any suggested budget bid for 2027-28, clearly distinguishing between the one-off cost of recovering the service and the recurrent resources required to maintain it, so that Councillors can make an informed decision weighing up the costs of any necessary bid with any additional savings that will need to be made elsewhere

·      Publish a clear statement for residents setting out the division of responsibilities between the City Council, County Council and other landowners; service priorities and standards; seasonal constraints; and how urgent concerns should be reported and escalated.

·      Introduce transparent performance reporting covering areas completed, outstanding initial treatments, repeat visits, complaints, service requests, costs and operational learning.

·      Report the findings of the review, together with costed options and a revised delivery programme, to the relevant scrutiny committee within an agreed timescale