Council and democracy
Home > Council and Democracy > Agenda item
Minutes:
The Committee
received a reserved matters application.
The reserved matters application sought approval for the second housing
phase (known as BDW2) including 323 dwellings with associated internal roads,
car parking, landscaping, amenity and public open
space. The Reserved Matters include access, appearance, landscaping, layout and
scale and related partial discharge of conditions 8, 10, 14, 17, 18, 22, 25,
26, 28, 35, 40, 49, 52, 58, 62, 63, 66 and 69 pursuant to outline approval
07/0003/OUT
The Principal Planner updated their report by referring to the Amendment
Sheet which read as follows:
Following publication of the agenda, a further representation was
received from the owner/occupier of 29 Woodlark Road about drainage issues with
particular interest in the works to the ditch to the rear of Woodlark Road and
bunding. A link to the Committee report was provided and the relevant sections
were highlighted showing how these matters have been assessed, including the
recommended conditions condition 6 (landscape management and maintenance plan),
condition 18 (ditch maintenance) and condition 19 (bund construction detail).
The third party responded to advise their concerns had been addressed. A copy
of the representation has been added to the application file
Mr Chris Fry (Applicant) addressed the Committee in support of the
application.
The Committee raised the
following comments in response to the Officer’s presentation and report:
i.
Thanked
the Officers for working with the applicant to enable such positive changes in
response to the previously refused application.
ii.
The application was much improved which would
benefit both current and future residents.
iii.
Welcomed cycle parking at the front of the
dwellings on some plots and queried how access to the cycle parking at the rear
of other properties would be gained.
iv.
Queried if it were possible to include a condition
that would allow those car parking spaces to be used for more cycle parking
(particularly for cargo bikes) or car club spaces. Information should be supplied to homeowners
to incentivise these initiatives.
v.
It was vital to future proof all sites for adequate
cycle and car club parking to assist in the reduction of carbon emissions in
the city.
vi.
Would like to be certain that green roofs were
standard for bins and cycle storage.
vii.
Suggested there should be no permitted development
on the site.
viii.
Expressed concern that additional equipment placed
on the buildings by residents such as satellite dishes and tv ariels would eradicate the aesthetics of the architecture
of the site and this should not be allowed to occur.
ix.
Recommended that hedgehog holes were standard as
part of the relevant fencing condition.
x.
Worried that a desire line being created across the
pavilion green could also be used by motorised two-wheel vehicles; this would
create a risk to the children’s play area and was not good design.
xi.
Suggested the hedgerow to the east of the
allotments should be a footpath creating an easier route for residents to
access the plots; asked if this could be supported as part of the landscape
condition.
xii.
Expressed concern at the four flats which had no
outside amenity space. Suggested a small balcony could be installed for each
flat and asked how close they were to communal open spaces.
xiii.
Asked who would take responsibility for the play
spaces.
xiv.
Conveyed unease at the delay in phasing, such as
the delay in installation of the Toucan Crossing on Huntingdon Road, the
cycling upgrade on Histon Road and the temporary community centre as examples.
xv.
Questioned how the Committee could monitor the
conditions placed on the application and others which had been agreed by the
Committee; suggested the creation and maintenance of a risk register to track
possible monitoring, delays and compliance.
xvi.
Requested an informative to Building Regulations
Part O (Overheating) and F (Ventilation) were followed; these should apply to
all future applications.
xvii.
Enquired what future proofing had been made to
ensure that residents would be safeguarded from the buildings overheating and
solar gain in summer.
xviii.
Queried what provisions had been made for passive
cooling.
xix.
Important to ensure there is enough room for air
source heat pumps; asked how this additional space could be guaranteed.
xx.
Welcomed the provisions of electric vehicle
charging points but when combined with potential future heat pumps this would
have a significant strain on the limited electric supply; the provision of
solar photovoltaic panels had to be investigated.
xxi.
Questioned if the developers would be able to meet
the future electricity needs of this site. 1 kilowatt per residential unit as
referenced by the sustainability officer was just a start.
xxii.
Suggested the use of Smart Tariffs and Smart
electric vehicle chargers on site.
xxiii.
Asked if buyers specify a heat pump and
architectural features of their home.
The Principal Planner, the
Delivery Manager Strategic Sites, the Sustainability Officer and Chair
responded to the Committee’s comments with the following:
i.
Cycle storage at the rear of the property could be
accessed through the car port and not through the house.
ii.
The car parking arrangements were different for
each house type; the width of the car ports had been expanded to allow access
to the cycle parking in accordance with guidance.
iii.
Would look to see if and how cycle parking at the
front of the properties could be incorporated for future phases.
iv.
There was no requirement on the outline consent for
car parking spaces to be retained. Future occupants would have the option to
change the car parking spaces to cycle parking.
v.
Car club spaces are secured via condition on the
outline consent and are provided for in the Local Centre and BDW5/6 parcels.
The outline consent was for a minimum number of car club parking spaces.
Therefore, there was no upper limit to the number of spaces that could be
provided on-site which could increase if there is demand. Since the outline
consent had been granted in 2013, the popularity of car clubs had increased.
vi.
Details of the green roofs for bin and cycle
storage would be secured through the resubmission of information to discharge
those conditions on the outline consent.
vii.
Consideration had been given to whether balconies
could be installed onto the four flats with no outside space. Inset balconies
would take away some of the internal space and a hung balcony would not be
possible. Tracking diagrams had suggested the overhang could cause issues for
certain vehicles such as refuse trucks.
viii.
The two of the four flats highlighted were located
centrally on site set in a mews area with shared surface spaces. The other two
were in close proximity to a central park.
ix.
This flat over garage house type has been
previously used elsewhere on Cambridge growth sites. Officers would be
reluctant to seek a condition for external amenity space to be added to these
units because it could be unreasonable as it might not be possible to comply
due to the constraints referenced.
x.
Advised the Committee to consider the scheme that
had been presented as a whole and that the outline consent does not require any
external space standards to be met.
xi.
Confirmed the City Council would be responsible for
the maintenance of the play spaces.
xii.
Advised that a meeting had been held with the
County Council’s Highway Engineer to discuss the Toucan Crossing on Huntingdon
Road. They were supportive of the delay in its delivery as there needed to be a
certain volume of use before its installation. Did not believe the delay to be
a safety issue.
xiii.
The Chair of the Committee had raised the issue
with the Joint Director of Planning and Economic Development of how the
performance of developers across the planning service in terms of meeting
Section 106 trigger points could be better monitored and enforced. It was suggested that matter could be
brought forward to a Member Briefing session for further discussion.
xiv.
The issue of overheating had been discussed in
detail with the developer.
xv.
The scheme would be subject to the new Part F
requirement under the Building Regulations with regard to ventilation.
xvi.
Condition 12 referenced the need for external space
for air source heat pumps.
xvii.
Photovoltaic panels had been included across the
site, at least 1 kilowatt of photovoltaic panels per residential unit. The
developer would have discussed sufficient grid capacity to meet demand with UK
Power Network.
xviii.
Work was currently being undertaken to look at the
future electricity infrastructure and requirements for the city and Greater
Cambridgeshire. This was primarily for new growth with allowances for the
retrofit of existing stock.
xix.
The difficulty in buyers requesting additional
technology was specifying these requirements at the right stage of the build,
which was usually very early in the build process.
xx.
There was an issue of supply with the air source
heat pumps therefore, any buyer should make their request before the build
started.
xxi.
The landscape and play proposals for pavilion green
have been discussed with the Landscape Team and City Council Streets and Open
Spaces Team and designed to minimise conflict.
Nonetheless, further discussions would be held with the applicant on
alternative proposals to address concerns raised. Recommend that outline condition 14 relating
to hard and soft landscaping scheme is not approved today allowing for a
resubmission to be made with alternative proposals after further discussions
between the applicant and planning officers.
Councillor Porrer proposed an additional informative supporting the
transformation of car parking spaces to car club spaces or alternative cycle
parking space.
This amendment was carried
unanimously.
Councillor Baigent proposed the following amendments to the Officer’s
recommendations:
·
Removal of permitted developments rights with
regard to installation of satellite dishes and aerials.
·
Removal of permitted development rights regarding
extensions to properties.
These amendments
were carried unanimously.
Councillor Thornburrow proposed the following informative to the
Officer’s recommendations:
· Additional
informative regarding Building Regulations Parts F and O.
This informative was
carried unanimously.
The Committee:
The Committee unanimously resolved to:
i.
Approve planning
permission of reserved matters application reference 21/04431/REM, subject to
a)
the conditions and informatives set out in the Officer’s report (section 25)
from p105 of the agenda pack:
· an additional
informative regarding supporting the transformation of car parking spaces to
car club spaces or alternative cycle parking space – with delegated authority
to Officers to agree the wording;
· the removal of
permitted development rights regarding the conversion of garages to a habitable
space, with delegated authority to Officers to agree
the wording;
· the removal of
permitted development rights regarding extensions to properties with delegated
authority to Officers to agree the wording; and
· an additional
informative regarding Building Regulations in regard to sustainability.
ii.
Authority delegated to
Officers to carry through minor amendments to those conditions and informatives (and include others considered appropriate and
necessary) prior to the issuing of the planning permission.
iii.
Approve / not approve partial discharge of the
following outline planning conditions (planning application reference
07/0003/OUT) in relation to the BDW2 parcel reserved matters according to the
recommendations for each condition set out in the table below (deleted text
struck through and additional text underlined :
Condition Submitted |
Recommendation |
Condition 8 Design Code Compliance |
Part discharge |
Condition 10 Youth Facility and Children’s Play
Provision |
Not approved |
Condition 14 Soft and Hard Landscaping |
Not approved |
Condition 17 Tree and Hedges Protection |
Not approved |
Condition 18 Tree Protection |
Not approved |
Condition 22 Allotment Strategy |
Not approved |
Condition 25 Affordable Housing |
Part discharge |
Condition 26 Accessible Dwellings |
Part discharge |
Condition 28 Renewable Energy |
Part discharge |
Condition 35 Detailed Surface Water Strategy |
Part discharge |
Condition 40 Ecological Conservation Management
Plan Statement |
Part discharge |
Condition 49 Secure Parking of Bicycles |
Not approved |
Condition 52 Construction Management Plan |
Part discharge |
Condition 58 Noise Assessment for future
residents |
Part discharge |
Condition 62 Domestic and Trade Waste |
Not approved |
Condition 63 Construction Waste Management |
Part discharge |
Condition 66 Lighting |
Not approved |
Condition 69 Public Art |
Not approved |
*Officer to discuss alternative proposals for pavilion green open space desire lines and to secure hedgehog holes with the developer.
Supporting documents: