PRE-APPLICATION BRIEFING BY THE DEVELOPER - (UKCRIC, West Cambridge Campus, Madingley Road) Approx: 10:00 am – 11:30 am UKCRIC, West Cambridge Campus, Madingley
Road Existing West Cambridge site – general context The West Cambridge Site is a major new academic
development being undertaken by the University of Cambridge. Development has begun in accordance with the
approved planning permission in 1999. The West Cambridge Site has been slow to develop.
Perceptions of the site include concerns over remoteness, isolation, lack of
social life, high car dependency and lack of character. Some elements of the public realm which have
been provided, such as the western lake, are open and exposed as development is
yet to complement it. There is a general
lack of activity on site. Car parking dominates the site and severs the public
realm from buildings. The site suffers
from a lack of facilities, although the sports centre has helped start to
readdress this issue over the last 18 months. The Council has identified an overall strategic
need for further employment growth across the City in the emerging Local Plan,
including making more efficient use of existing employment sites. The densification of the West Cambridge site
is acceptable in principle, subject to environmental, amenity and transport
assessment as set out within emerging Local Plan Policy 18. The need for a
‘comprehensive development approach’ has been agreed through the ‘statement of
common ground’ to mitigate the uplift in academic and commercial floor space
that will be provided. The proposal The pre application proposal is for the next phases
of the relocation of the Department of Engineering from its existing site on
Fen Causeway. The proposed building will have four levels of accommodation with
a footprint of 4,500 sq m. This is part of an overall strategy to
provide 100,000 sq m of academic floor space on the
east side of the revised West Cambridge masterplan. The outline application 16/1134/OUT was submitted on 16 June 2016 and is currently under
determination. The proposed application site is situated on the
eastern side of JJ Thomson Avenue to the rear of the Centre for Advanced
Photonics and Electronics (CAPE). It
falls within ‘East Forum key place’, ‘East Green Link’ and ‘Clerk Maxwell Road
site edge’ within the Design Guide which accompanies the West Cambridge outline
application. This proposal needs to be considered in context
with the emerging outline application, parameter plans, Design Guide and other
associated strategies. The outline
application itself is currently under review and may be subject to change. Because of the timescales involved, UKCRIC is
likely to be submitted as a separate full planning application. The key issues are: -
Compliance
with the emerging parameter plans and Design Guide for the revised West Cambridge
outline permission. -
Design
and appearance of the building in context. -
Massing
and street scene. -
Active
frontages and shared facilities. -
Landscape
strategy. -
Drainage
approach. -
Servicing
and access. -
Cycle
parking strategy. - Inclusive access. Minutes: The proposal The pre application proposal is for the next phases of
the relocation of the Department of Engineering from its existing site on Fen
Causeway. The proposed building will have four levels of accommodation with a
footprint of 4,500 sq m. This is part of an overall strategy to
provide 100,000 sq m of academic floor space on the
east side of the revised West Cambridge masterplan. The outline
application 16/1134/OUT was
submitted on 16 June 2016 and is currently under determination. The proposed application site is situated on the
eastern side of JJ Thomson Avenue to the rear of the Centre for Advanced
Photonics and Electronics (CAPE). It
falls within ‘East Forum key place’, ‘East Green Link’ and ‘Clerk Maxwell Road
site edge’ within the Design Guide which accompanies the West Cambridge outline
application. This
proposal needs to be considered in context with the emerging outline
application, parameter plans, Design Guide and other associated
strategies. The outline application
itself is currently under review and may be subject to change. Because
of the timescales involved, UKCRIC is likely to be submitted as a separate full
planning application. 1) Key Points
from Developer Presentation - Relocation
to West Cambridge – UKCRIC part of
a wider relocation strategy. - Grant
funding secured, subject to tight
programme deadlines. - Separate
full planning application will be
required because of the longer timeframe which is required to negotiate the new
outline application for West Cambridge. - Inset
Masterplan – developed for
Engineering to inform the wider West Cambridge Masterplan. - Adaptable
building layout is intended for
Engineering to meet current and future needs. - Modular
expansion will be possible as and when funding
becomes available. - Ecology
Strategy will be submitted to maintain and
enhance the landscaped bund to the east. - West
elevation has been carefully considered and will
have an equal level of detail and visual interest as the principal east
elevation. - Main
entrance - is positioned to enhance the
existing garden to the CAPE building. - Social
Spaces – existing campus lacks communal
spaces to facilitate 21st century research. - Strong floor
– is integral to the design to enable
hydraulic testing to be carried out without disturbance to adjacent residential
properties and academic buildings. - Acoustic
‘box within a box’ is integral to
the design. - Cycle
provision will be integrated into the design. - BREEAM excellent is targeted. - Energy
reduction - is a key focus. 2) Member
Questions 1) The existing
Fen Causeway site appears to be a stable home for Engineering and the James
Dyson building has only recently been constructed. How does the strategy of relocation relate to
this context? - The James Dyson building was necessary to
relieve the immediate pressure for Engineering to carry out their research and
activities. - Engineering has six divisions, two of which
are already at West Cambridge.
Engineering is the largest department in the University. - The relocation to West Cambridge is part of a much wider ... view the full minutes text for item 16/9/Plan |