57 19/0340/FUL - John Banks Honda 444 Newmarket Road PDF 227 KB
Minutes:
The Committee
received an application for full planning permission.
The application
sought approval for erection of student accommodation with 154 student rooms
(following demolition of existing buildings). Together with ancillary accommodation
comprising common/study rooms, laundry room, management office, plant room, bin
and bicycle enclosures, landscaping and associated infrastructure including a
Sub-Station.
The Principal Planner updated his report by referring to amended conditions
on the Amendment Sheet. Details had been changed in response to comments from
consultees that had been received close to the committee date.
The Committee received a representation in objection to the application
from a Camcycle Representative.
i.
This application was not truly
sustainable.
ii.
People would have difficulty
accessing the site by bicycle.
iii.
It would be difficult to access
the Chisholm Trail.
iv.
If the application were to be
approved, the following might be appropriate to secure by condition:
a.
Power assisted cycle storage
facilities.
b.
A toucan crossing near the site.
The Committee received a representation in objection to the application
from a Cambridge Past, Present and Future Representative.
i.
CPPF did not object to the
application of itself.
ii.
Expressed concern that modern
flats were being installed behind the Leper Chapel. This would cause harm to
the setting of the chapel, as referenced in the Urban Design Team’s comments
(P38 of the agenda pack).
iii.
The city was growing, this
development could impact on its character. Any harm done to the historic
character needed to be mitigated in some way.
iv.
If this application were approved
some form of compensation was required to mitigate its appearance in the
setting of the Leper Chapel, plus the local distinctiveness provided by
Barnwell Lake and the adjoining meadows.
Mr Pittock (Applicant’s Agent) addressed the Committee in support of the
application.
Councillor Sargeant proposed an amendment to the Officer’s
recommendation to remove reference to “local”
in “local resident streets” in the student management plan to mitigate parking
across the city.
The amendment was carried
unanimously.
Councillor Thornburrow proposed an amendment to the Officer’s
recommendation that the drainage management
scheme should be in place prior to commencement.
This amendment was carried
unanimously.
The Committee:
Resolved (by 6 votes to 1) to grant the
application for planning permission in accordance with the officer recommendation,
for the reasons set out in the officer’s report, subject to:
i.
The conditions recommended by the
Officers.
ii.
The prior completion of a S106
Agreement to secure:
a.
The financial contributions specified in paragraphs
8.32 – 8.34 with delegated authority for officers to negotiate an appropriate
financial contribution for a toucan crossing (if required) as described in
paragraph 8.35; and
b.
A planning obligation which secures the planning
objectives in the Cambridge Local Plan 2018 Policy 46 and its supporting text
(For the avoidance of doubt these objectives are: the securement of a formal
agreement and appropriate controls, to ensure the development is solely
occupied by the identified institution, Anglia Ruskin University, during term
time and to ensure Proctorial control over the ownership of cars by students
occupying the development.); and
iii.
The following additional
conditions:
Environmental
Health conditions
Plant noise condition
Prior to the installation of plant, a scheme for the insulation of the
plant in order to minimise the level of noise emanating from the said plant
shall be submitted to and approved in writing by the local planning authority
and the scheme as approved shall be fully implemented before the use hereby
permitted is commenced.
Acoustic assessment compliance
The noise insulation scheme and mitigation requirements as stated within
the Cass Allen “noise assessment” revision 2 dated 4th March 2019
(RP01-18774) shall be fully implemented, maintained and not altered.
Artificial Lighting
Prior to the installation of any artificial lighting, an artificial
lighting scheme shall be submitted to and approved in writing by the local
planning authority. The scheme shall
include details of any artificial lighting of the site and an artificial
lighting impact assessment with predicted lighting levels at proposed and
existing residential properties shall be undertaken. Artificial lighting on and off site must meet
the Obtrusive Light Limitations for Exterior Lighting Installations contained
within the Institute of Lighting
Professionals Guidance Notes for the Reduction of Obtrusive Light - GN01:2011
(or as superseded).
The approved lighting scheme shall be installed, maintained and operated
in accordance with the approved details / measures.
Alternative ventilation scheme
Prior to the commencement of development/construction, details of an
alternative ventilation scheme for the accommodation units to negate / replace
the need to open windows, in order to protect future occupiers from external
traffic noise shall be submitted to and approved in writing by the local
planning authority. Full details are also required of the operating noise
level of the alternative ventilation system.
The scheme shall be installed before the use hereby permitted is
commenced and shall be fully retained thereafter.
Drainage Conditions
Surface water drainage scheme
No development, apart from
above ground works and demolition, hereby permitted shall be commenced until a
surface water drainage scheme for the site, based on sustainable drainage
principles and in accordance with Cambridge City Council local plan policies,
has been submitted to and approved in writing by the local planning authority.
The scheme shall subsequently be implemented in accordance with the approved
details before the development is occupied.
The scheme shall be based
upon the principles within the agreed Flood risk and drainage strategy prepared
by Richard Jackson (ref: 48949) dated March 2019 and shall also include:
a)
Details of the existing surface water drainage arrangements
including runoff rates for the QBAR, 3.3% Annual Exceedance Probability (AEP)
(1 in 30) and 1% AEP (1 in 100) storm events;
b)
Full results of the proposed drainage system modelling in the
above-referenced storm events (as well as 1% AEP plus climate change) ,
inclusive of all collection, conveyance, storage, flow control and disposal
elements and including an allowance for urban creep, together with a schematic of
how the system has been represented within the hydraulic model;
c)
Detailed drawings of the entire proposed surface water
drainage system, including levels, gradients, dimensions, pipe reference
numbers, green roof, permeable paving and rain gardens;
d)
A plan of the drained site area and which part of the
proposed drainage system these will drain to;
e)
Full details of the proposed attenuation and flow control
measures;
f)
Site Investigation and test results to confirm infiltration
rates;
g)
Temporary storage facilities if the development is to be
phased;
h)
A timetable for implementation if the development is to be
phased;
i)
Details of overland flood flow routes in the event of system
exceedance, with demonstration that such flows can be appropriately managed on
site without increasing flood risk to occupants;
j)
Full details of the maintenance/adoption of the surface water
drainage system;
k)
Measures taken to prevent pollution of the receiving
groundwater and/or surface water
l)
Formal agreement from a third party if discharging into their
system is proposed, including confirmation (and evidence where appropriate)
that sufficient capacity is available.
m) The
drainage scheme must adhere to the hierarchy of drainage options as outlined in
the NPPF PPG.
Reason
To ensure that the proposed
development can be adequately drained and to ensure that there is no increased
flood risk on or off site resulting from the proposed development.
Management and Maintenance
No development, apart from
above ground works and demolition, hereby permitted shall be commenced until
details for the long-term maintenance arrangements for the surface water
drainage system (including all SuDS features) to be submitted to and approved
in writing by the Local Planning Authority. The submitted details should
identify runoff sub-catchments, SuDS components, control structures, flow
routes and outfalls. In addition, the plan must clarify the access that is
required to each surface water management component for maintenance purposes.
The maintenance plan shall be carried out in full thereafter.
Reason
To ensure the satisfactory
maintenance of drainage systems that are not publically adopted, in accordance
with the requirements of paragraphs 163 and 165 of the National Planning Policy
Framework.
Foul Drainage
No building hereby permitted
shall be occupied until foul water drainage works have been implemented in
accordance with details that have been submitted to and approved in writing by
the local planning authority.
Reason
To ensure that the proposed
development can be adequately drained and to ensure that there is no increased
flood risk on or off site resulting from the proposed development
Green Roof Policy
Notwithstanding the approved plans, all flat roofed elements within the
development shall be green or brown roofs. No development above ground level,
other than demolition, shall commence until full details of these green or
brown roofs have been submitted to and approved in writing by the local
planning authority and these works shall be carried out as approved. The details shall include details of
build-ups, make up of substrates, planting plans for biodiverse roofs,
methodologies for translocation strategy and drainage details where applicable.
The green roofs shall be installed in accordance with the approved details and
shall be maintained thereafter.
Reason: In the interests of responding suitably to climate change and
water management (Cambridge Local Plan 2018 policy 31)
Management Condition
The development shall be
occupied and managed only in accordance with a Student Housing Management Plan
that shall be submitted to and approved in writing by the local planning
authority prior to commencement of occupation of the development and shall
prohibit students from owning cars within the city.
Reason: In the interests of
residential amenity and impact on the local highway network (Cambridge Local